|
72. Herohalli
|
|||
|
|
| Issues
Posted in Herohalli by niranjan.vyas
This area is neglected from long time. This area requires infrastructure development.
Posted in Herohalli
Street light maintenance though contracted, lacks proper upkeep and replacement of fused our lamps. Newly constructed storm water drains are dumped with trash. Needs to be provided with more dust bins as many donot avail the facility of door to door collection of solid waste. Asphalting of arterial roads are done on random basis. Our layout roads are left out. WE IDENTIFY OUR LAYOUT AS: Posted in Herohalli
Water is not flowing in the drainage at 13th 'C' cross, Kempegowdanagar-560091, as height is more in frontend compare with backend of the raod. which was laid during formation of layout 10 years back. Also some slabs are missing. Due to stagnation of water, mosqutoes breeds easily. Asphalting of 13th cross & 13th "A, B, C D and E" crosses.
Posted in Herohalli Infrastructure Development not done in vigneshwara nagar. Tar raod work in not don in this area .Mahadeshwara nagar full small road is fulley tar road and also one park & play ground not thare pls see tihs area is also Posted in Herohalli by chaluchacha
Rejuvenation of Herohalli Lake is nearing completion but the Storm Water Drain on the periphery of Sri Venkateshvara Layout is not complete and currently used as dumping grounds for solid waste breeding mosquitoes.
|
Post an issue that affects your ward |
|
Candidate Affidavits (List all candidates)
Candidate Profiles
Anantharaju
Contesting from: Herohalli. Posted by Naveen_rc
Age: 30, Gender: Male
|
Please Login to profile a Candidate. |
| Resident Welfare Associations
Posted in Herohalli by LPO rwa
Sir Visvesvaraya Nagara BDA Layout (FE) 8th Block, is a layout formed by the BDA in 2004
|
Please Login to add an RWA. |
Comments (Hide)
Comments will be listed here once they are approved by the moderators